Locus A.7K71.004

General Information

Locus Type:

Installation

Supervisor:

D. Holloway

Designation:

Plastered pool

Reason:

Installation of plaster appeared. Plaster on stone

Top Separation:

Very Clear

Bottom Separation:

Very Clear

Start Date:

05 Jul, 1987

End Date:

24 Jun, 1994

Interpretation

Function:

Ritual pool; plaster indicates it contained water

Stratigraphy remarks:

Foundation cut into IR1 & IR2 fill

Balk:

Phase:

Stratum :

Installation Description

Type

Certain:

Probable:

Ritual pool

Possible 1:

Cistern

Possible 2:

Material

Limestone Qualifier 1:

Limestone Qualifier 2:

Limestone Percent:

Bedrock Qualifier 1:

Bedrock Qualifier 2:

Bedrock Percent:

0

Ceramic Qualifier 1:

Ceramic Qualifier 2:

Ceramic Percent:

0

Mud Qualifier 1:

Mud Qualifier 2:

Mud Percent:

Mudbrick Qualifier 1:

Mudbrick Qualifier 2:

Mudbrick Percent:

Nari Qualifier 1:

Nari Qualifier 2:

Nari Percent:

0

Plaster Qualifier 1:

Hard

Plaster Qualifier 2:

Plaster Percent:

0

Earth Qualifier 1:

Earth Qualifier 2:

Earth Percent:

0

Stone Qualifier 1:

Hard

Stone Qualifier 2:

Stone Percent:

94

Plan

Type:

Rectangular

Quality 1:

Nearly

Quality 2:

Remarks:

Lining

Lining:

Plaster

Measurements

Greatest Length in meters:

3.6

Greatest width in meters:

0

Smallest width in meters:

1.8

Greatest Height in meters:

1.45

Lowest Height in meters:

0.25

Orientation (degrees):

24

Remarks

Remarks:

The foundation for the pool and the foundation for the buttressing was created on level surfaces; W balk removal has revealed the size and stairs

Levels

Location Top Level Bottom Level
7 0 912.38
8 913.92 912.22
13 913.99 912.12
13 912.56 0
14 914.07 912.16
14 912.57 0

Stratigraphy

Under Earth layer A7K71:001
Under Earth layer A7K71:002
Equals Installation B7K81:006
Equals Installation B7K80:024
Equals Installation A7K70:006
Abuts Wall A7K71:007
Sealed agnst by Earth layer A7K71:006
Equals Installation A7K70:011
Over Earth layer A7K71:037
Cuts Surface A7K71:008
Cuts Earth layer A7K71:009
Cuts Earth layer A7K71:019
Cuts Earth layer A7K71:020
Cuts Earth layer A7K71:022
Cuts Earth layer A7K71:023

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
07 Jul, 1987 87A71116 Progress
08 Jul, 1987 87A71115 Progress
09 Jul, 1987 87A71117 Progress
09 Jul, 1987 87A71118 Installation photo S
09 Jul, 1987 87A71119 Installation photo W
10 Jul, 1987 87A71120 Progress
13 Jul, 1987 87A71121 Progress
14 Jul, 1987 87A71122 Progress
15 Jul, 1987 87A71123 Progress
16 Jul, 1987 87A71124 Progress
17 Jul, 1987 87A71125 Progress
20 Jul, 1987 87A71126 Progress
21 Jul, 1987 87A71127 Progress
22 Jul, 1987 87A71128 Progress
23 Jul, 1987 87A71129 Progress
24 Jul, 1987 87A71132 Progress
27 Jul, 1987 87A71133 Progress
29 Jul, 1987 87A71136 Progress
30 Jul, 1987 87A71137 Progress
31 Jul, 1987 87A71138 Progress
03 Aug, 1987 87A71140 Progress
06 Jul, 1987 87A71114 Progress
16 Jun, 1994 94A70033 Pre-excavation
17 Jun, 1994 94A70034 Cleanup
20 Jun, 1994 94A70035 Progress
21 Jun, 1994 94A70036 Removing Pool 4
22 Jun, 1994 94A70037 Removing Pool 4
23 Jun, 1994 94A70038 Progress
02 Jul, 1987 87A71112 Progress
24 Jun, 1994 94A70039 Progress