Locus A.7K50.076

General Information

Locus Type:

Architecture

Supervisor:

v. kopecky

Designation:

e-w wall; s. wall ir2b house

Reason:

stones in line

Top Separation:

Bottom Separation:

Average

Start Date:

11 Jul, 2012

End Date:

11 Jul, 2012

Interpretation

Function:

Stratigraphy remarks:

Balk:

Phase:

Stratum :

Architecture Description

Material

chert Qualifier 1:

None

chert Qualifier 2:

chert Qualifier 3:

chert Percent:

Limestone Qualifier 1:

Limestone Qualifier 2:

Limesotne Qualifier 3:

Limestone Percent:

basalt Qualifier 1:

basalt Qualifier 2:

basalt Qualifier 3:

basalt Percent:

nari Qualifier 1:

nari Qualifier 2:

nari Qualifier 3:

nari Percent:

mudbrick Qualifier 1:

mudbrick Qualifier 2:

mudbrick Qualifier 3:

mudbrick Percent:

Arch Frags:

Fragment Type:

Quarry:

Wall Stones

Cobble (6-25 cm) %:

Small Boulder (25-50cm) %:

Medium Boulder (50-75cm) %:

Large Boulder (75-100cm) %:

Very Large Boulder (>1 m) %:

Chinkstones

Pebble (.2-6 cm) %:

Cobble (6-25 cm) %:

Fillstones: (in Rubble-filled Construction)

Cobble (6-25 cm) %:

Small Boulder (25-50cm) %:

Medium Boulder (50-75cm) %:

Large Boulder (75-100cm) %:

Very Large Boulder (>1 m) %:

Brick

Length (upper):

Length (lower):

Width (upper):

Width (lower):

Depth (upper):

Depth (lower):

Dressing: (Stone Only)

Unhewn %:

Semi-hewn %:

Dressed %:

Ashlar %:

Bossed %:

Tooling (Stone Only)

Upper Width:

Lower Width:

Upper Length:

Lower Length:

Sketch:

Photo:

Mortar

Dry-laid %:

Clay %:

Mud %:

Cement %:

Plaster %:

Average Thickness:

Facing

Facing:

Color:

Construction

Style:

Support:

Tendencies:

Courses

Highest Count:

Lowest Count:

Random:

Rows

Highest Count:

Lowest Count:

Two with Rubble:

Random:

Measurements

Greatest Length in meters:

0.32

Greatest width in meters:

0.35

Smallest width in meters:

0.35

Greatest Height in meters:

0.13

Lowest Height in meters:

0.16

Orientation (degrees):

Dip (degrees):

Preservation

Preservation:

Lean Direction (degrees):

Lean Degrees:

Top Foundation Level:

Remarks

Remarks:

Wall had not assigned clear locus in previous season but clearly was South wall of IR2b house. It may have been constructed on top IR1 wall. Wall crumbled prior 2012. Everything what was left from crumbled wall was removed.elevation measured. Reopened 2012. Recorded 2012. Top plan drawing started at NE wall 41; continue with S wall 7. Wall was renowned. Drawing not completed today.

Levels

Location Top Level Bottom Level
1 913.78 912.53

Stratigraphy

Equals Wall A7k60:064
Equals Wall A7j69:069
Abuts Wall A7k60:013
Abuts Wall 7j69:008

Pails

Number Date Baskets Total Diagnostic Published
285 12 Jul, 2012 7

Pottery Readings

Count Quantity modifier Form Period Period modifier Question
5 Bod Iron

Photos

Date Photo Number Subject Photo