Locus A.7K50.059

General Information

Locus Type:

Installation

Supervisor:

A. Davis

Designation:

Blockage in door at W end of Wall 33

Reason:

Rubble in a door

Top Separation:

Clear

Bottom Separation:

Clear

Start Date:

07 Jul, 2008

End Date:

09 Jul, 2008

Interpretation

Function:

Blockage in the doorway at W end of Wall 33

Stratigraphy remarks:

Later than Wall 33

Balk:

Phase:

Stratum :

Installation Description

Type

Certain:

Wall Blockage

Probable:

Possible 1:

Possible 2:

Material

Limestone Qualifier 1:

Hard

Limestone Qualifier 2:

Limestone Percent:

100

Bedrock Qualifier 1:

Bedrock Qualifier 2:

Bedrock Percent:

0

Ceramic Qualifier 1:

Ceramic Qualifier 2:

Ceramic Percent:

0

Mud Qualifier 1:

Mud Qualifier 2:

Mud Percent:

Mudbrick Qualifier 1:

Mudbrick Qualifier 2:

Mudbrick Percent:

Nari Qualifier 1:

Nari Qualifier 2:

Nari Percent:

0

Plaster Qualifier 1:

Plaster Qualifier 2:

Plaster Percent:

0

Earth Qualifier 1:

Earth Qualifier 2:

Earth Percent:

0

Stone Qualifier 1:

Stone Qualifier 2:

Stone Percent:

0

Plan

Type:

Linear

Quality 1:

None

Quality 2:

Remarks:

Lining

Lining:

None

Measurements

Greatest Length in meters:

1

Greatest width in meters:

0.4

Smallest width in meters:

0.25

Greatest Height in meters:

1.25

Lowest Height in meters:

1

Orientation (degrees):

0

Remarks

Remarks:

The blockage was not well coursed

Levels

Location Top Level Bottom Level
1 913.01 911.75

Stratigraphy

Over Earth layer A7K50:071
Sealed agnst by Earth layer A7K50:058
Sealed agnst by Earth layer A7K50:055

Pails

Number Date Baskets Total Diagnostic Published
164 08 Jul, 2008 10 3 0 0

Pottery Readings

Count Quantity modifier Form Period Period modifier Question
0 Iron 1 bods
0 Iron 1 bods
164 08 Jul, 2008 14 3 1 0

Photos

Date Photo Number Subject Photo
08 Jul, 2008 08A50173 Progress
09 Jul, 2008 08A50195 Progress
13 Jul, 2012 12A50046 BEGINNING OF SEASON
07 Aug, 2012 12A50371 FINAL