Locus Type:
Installation
Supervisor:
C. Shaw
Designation:
Foundation trench for upper part of Wall 7
Reason:
Change in color beside Wall 7
Top Separation:
Clear
Bottom Separation:
Average
Start Date:
08 Jul, 2004
End Date:
19 Jul, 2004
Function:
FT for upper part of Wall 7
Stratigraphy remarks:
Earlier than the upper part of Wall 7, but later than the lower part
Balk:
Phase:
Stratum :
Certain:
Probable:
Possible 1:
Foundation trench
Possible 2:
Limestone Qualifier 1:
Limestone Qualifier 2:
Limestone Percent:
0
Bedrock Qualifier 1:
Bedrock Qualifier 2:
Bedrock Percent:
0
Ceramic Qualifier 1:
Ceramic Qualifier 2:
Ceramic Percent:
0
Mud Qualifier 1:
Mud Qualifier 2:
Mud Percent:
Mudbrick Qualifier 1:
Mudbrick Qualifier 2:
Mudbrick Percent:
Nari Qualifier 1:
Nari Qualifier 2:
Nari Percent:
0
Plaster Qualifier 1:
Plaster Qualifier 2:
Plaster Percent:
0
Earth Qualifier 1:
Soft
Earth Qualifier 2:
Earth Percent:
100
Stone Qualifier 1:
Stone Qualifier 2:
Stone Percent:
0
Type:
Linear
Quality 1:
Rounded
Quality 2:
Remarks:
Lining:
None
Greatest Length in meters:
0
Greatest width in meters:
0
Smallest width in meters:
0.1
Greatest Height in meters:
0
Lowest Height in meters:
0.53
Orientation (degrees):
0
Remarks:
Because L 23 was cut, the top is unknown and the trench is assumed; this trench means there is a 2nd phase to Wall 7
| Location | Top Level | Bottom Level |
|---|---|---|
| 19 | 913.65 | 912.85 |
| Over | Earth layer | A7K50:022 |
| Cuts | Earth layer | A7K50:021 |
| Cuts | Earth layer | A7K50:022 |
| Cuts | Earth layer | A7K50:023 |
| Fill Loci | Earth layer | A7K50:032 |
| Number | Date | Baskets | Total | Diagnostic | Published |
|---|