Locus A.7K50.004

Architecture · N-S wall in E

General Information

Locus Type Architecture
Supervisor J. Fisher
Designation N-S wall in E
Reason 2 rows of stones in a line; lower courses subsequently visible
Top Separation Very Clear
Bottom Separation Clear
Start Date 06 Jul, 1984
End Date 03 Aug, 1984

Interpretation

Function Of sufficient size for defense; may block entry/passageway to S of Phase B wall
Stratigraphy remarks Appears to bond with Wall 7 & thus change an original ext angle turning to the E into an int angle (made with Wall 7) turning to the W or may block door/passage in Wall 4B which may possibly extend into 7K40
Balk
Phase
Stratum

Architecture Description

Material

chert Qualifier 1:

chert Qualifier 2:

chert Qualifier 3:

chert Percent:

0

Limestone Qualifier 1:

None

Limestone Qualifier 2:

Limesotne Qualifier 3:

Limestone Percent:

100

basalt Qualifier 1:

basalt Qualifier 2:

basalt Qualifier 3:

basalt Percent:

0

nari Qualifier 1:

nari Qualifier 2:

nari Qualifier 3:

nari Percent:

0

mudbrick Qualifier 1:

mudbrick Qualifier 2:

mudbrick Qualifier 3:

mudbrick Percent:

Arch Frags:

0

Fragment Type:

Quarry:

Wall Stones

Cobble (6-25 cm) %:

10

Small Boulder (25-50cm) %:

Medium Boulder (50-75cm) %:

70

Large Boulder (75-100cm) %:

10

Very Large Boulder (>1 m) %:

0

Chinkstones

Pebble (.2-6 cm) %:

0

Cobble (6-25 cm) %:

100

Fillstones: (in Rubble-filled Construction)

Cobble (6-25 cm) %:

0

Small Boulder (25-50cm) %:

0

Medium Boulder (50-75cm) %:

0

Large Boulder (75-100cm) %:

0

Very Large Boulder (>1 m) %:

0

Brick

Length (upper):

0.0

Length (lower):

0.0

Width (upper):

0.0

Width (lower):

0.0

Depth (upper):

0.0

Depth (lower):

0.0

Dressing: (Stone Only)

Unhewn %:

50

Semi-hewn %:

Dressed %:

0

Ashlar %:

0

Bossed %:

0

Tooling (Stone Only)

Upper Width:

0.0

Lower Width:

0.0

Upper Length:

0.0

Lower Length:

0.0

Sketch:

false

Photo:

false

Mortar

Dry-laid %:

100

Clay %:

0

Mud %:

0

Cement %:

0

Plaster %:

0

Average Thickness:

0.0

Facing

Facing:

Unfaced

Color:

Construction

Style:

Boulder & Chink

Support:

Free-standing

Tendencies:

Courses

Highest Count:

2

Lowest Count:

1

Random:

false

Rows

Highest Count:

2

Lowest Count:

1

Two with Rubble:

Random:

false

Measurements

Greatest Length in meters:

3.8

Greatest width in meters:

0

Smallest width in meters:

1.2

Greatest Height in meters:

0.9

Lowest Height in meters:

0.4

Orientation (degrees):

22

Dip (degrees):

0

Preservation

Preservation:

Partial Superstructure: Most

Lean Direction (degrees):

0

Lean Degrees:

0

Top Foundation Level:

Remarks

Remarks:

E balk obscures the E face making measurements impercise; of inferior workmanship compared to phase B wall below; courses & height are based in the depth of S 14

Levels

Location Top Level Bottom Level
11 913.46 0
17 913.38 0
17 913.48 0
23 913.5 0

Stratigraphy

Relationship Related to Related locus
Equals Wall A7K60:021
Under Earth layer A7K50:003
Over Wall A7K50:004
Over Earth layer A7K50:010
Sealed agnst by Earth layer A7K50:005
Bonded to Wall A7K50:007
Bonded to Wall A7K50:016
Under Wall A7K50:004
Abutted by Pit A7K50:011
Abutted by Wall A7K50:012
Abutted by Wall A7K50:017
Sealed agnst by Earth layer A7K50:008
Sealed agnst by Surface A7K50:009
Sealed agnst by Earth layer A7K50:010
Sealed agnst by Earth layer A7K50:013
Sealed agnst by Earth layer A7K50:015
Bonded to Wall A7K50:016

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
22 Jul, 2004 04A50264 Final from E
22 Jul, 2004 04A50268 Final from W
28 Jul, 2004 04A50009 U04 cleanup
29 Jun, 2004 04A50017 Progress
30 Jun, 2004 04A50029 Progress
01 Jul, 2004 04A50046 Progress
05 Jul, 2004 04A50081 Progress
06 Jul, 2004 04A50095 Progress
09 Jul, 2004 04A50136 Progress
12 Jul, 2004 04A50150 Progress
15 Jul, 2004 04A50186 Progress
16 Jul, 2004 04A50199 Progress
30 Jul, 1984 84A50481 E Balk
30 Jul, 1984 84A50481 E Balk
30 Jul, 1984 84A50477 S Balk
30 Jul, 1984 84A50477 S Balk
06 Jul, 1984 84A50119 Progress
09 Jul, 1984 84A50143 Progress
10 Jul, 1984 84A50161 Progress
11 Jul, 1984 84A50181 Progress
12 Jul, 1984 84A50203 Progress
13 Jul, 1984 84A50222 Progress
16 Jul, 1984 84A50242 Progress
16 Jul, 1984 84A50242 Progress
17 Jul, 1984 84A50262 Progress
17 Jul, 1984 84A50262 Progress
17 Jul, 1984 84A50263 Relation of Surf 9 to Walls 4,6, 7
17 Jul, 1984 84A50263 Relation of Surf 9 to Walls 4,6, 7
17 Jul, 1984 84A50264 Relation of Surf 9 to Walls 4,6, 7
17 Jul, 1984 84A50264 Relation of Surf 9 to Walls 4,6, 7
17 Jul, 1984 84A50265 Relation of Surf 9 to Walls 4,6, 7
17 Jul, 1984 84A50265 Relation of Surf 9 to Walls 4,6, 7
18 Jul, 1984 84A50289 Progress
18 Jul, 1984 84A50289 Progress
19 Jul, 1984 84A50311 Progress
19 Jul, 1984 84A50311 Progress
19 Jul, 1984 84A50313 Relation of Surf 10 to Surf 9 & Walls 4 & 6
19 Jul, 1984 84A50313 Relation of Surf 10 to Surf 9 & Walls 4 & 6
19 Jul, 1984 84A50314 Relation of Surf 9 & Walls 4, 6 & 7
19 Jul, 1984 84A50314 Relation of Surf 9 & Walls 4, 6 & 7
19 Jul, 1984 84A50315 Relation of Surf 9 & Walls 4, 6 & 7
19 Jul, 1984 84A50315 Relation of Surf 9 & Walls 4, 6 & 7
20 Jul, 1984 84A50333 Progress
20 Jul, 1984 84A50333 Progress
23 Jul, 1984 84A50355 Progress
23 Jul, 1984 84A50355 Progress
24 Jul, 1984 84A50367 Progress
24 Jul, 1984 84A50367 Progress
25 Jul, 1984 84A50401 Progress
26 Jul, 1984 84A50426 Progress
26 Jul, 1984 84A50426 Progress
26 Jul, 1984 84A50427 Relation of Surf 10 to Wall 12
26 Jul, 1984 84A50427 Relation of Surf 10 to Wall 12
26 Jul, 1984 84A50428 Relation of Surf 10 to Wall 12
26 Jul, 1984 84A50428 Relation of Surf 10 to Wall 12
26 Jul, 1984 84A50429 Relation of Surf 10 to Wall 12
26 Jul, 1984 84A50429 Relation of Surf 10 to Wall 12
27 Jul, 1984 84A50448 Progress
27 Jul, 1984 84A50448 Progress
27 Jul, 1984 84A50449 Wall 12 prior to removal
27 Jul, 1984 84A50449 Wall 12 prior to removal
27 Jul, 1984 84A50450 Blockage in Wall 4
27 Jul, 1984 84A50450 Blockage in Wall 4
30 Jul, 1984 84A50485 Progress
30 Jul, 1984 84A50485 Progress
31 Jul, 1984 84A50521 Progress
31 Jul, 1984 84A50521 Progress
01 Aug, 1984 84A50539 Progress E balk
01 Aug, 1984 84A50539 Progress E balk
02 Aug, 1984 84D77604 Progress E Balk removal
02 Aug, 1984 84D77604 Progress E Balk removal
03 Aug, 1984 84A50609 Progress E balk
03 Aug, 1984 84A50609 Progress E balk
25 Jul, 1984 8406-0825 Progress
02 Aug, 1984 84A50561 Basin in situ
05 Aug, 1984 84A50654 NE corner
05 Aug, 1984 84A50655 Blockage in Wall 4
05 Aug, 1984 84A50657 Final
05 Aug, 1984 84A50658 Wall 4B removed
06 Aug, 1984 84A50699 Final
06 Aug, 1984 84A50699 Final
06 Aug, 1984 8439-0306 Final
22 Jul, 2004 04A50256 Progress
22 Jul, 2004 04A50265 Final from S
06 Aug, 1984 84A50701 Final field
06 Aug, 1984 84A50701 Final field
06 Aug, 1984 84A50702 Final field
06 Aug, 1984 84A50702 Final field
06 Aug, 1984 84A50703 Final field
06 Aug, 1984 84A50703 Final field
06 Aug, 1984 84A50704 Final field
06 Aug, 1984 84A50704 Final field
12 Jul, 2012 12A50046 PROGRESS
16 Jul, 2012 12A50071 PROGRESS
13 Jul, 2012 12A50059 PROGRESS