Locus A.7K50.004

Architecture · N-S wall in E

General Information

Locus Type Architecture
Supervisor J. Fisher
Designation N-S wall in E
Reason 2 rows of stones in a line; lower courses subsequently visible
Top Separation Very Clear
Bottom Separation Clear
Start Date 6 July, 1984
End Date 3 August, 1984

Interpretation

Function Of sufficient size for defense; may block entry/passageway to S of Phase B wall
Stratigraphy remarks Appears to bond with Wall 7 & thus change an original ext angle turning to the E into an int angle (made with Wall 7) turning to the W or may block door/passage in Wall 4B which may possibly extend into 7K40
Balk
Phase
Stratum

Architecture Description

Material

chert Qualifier 1:

chert Qualifier 2:

chert Qualifier 3:

chert Percent:

0

Limestone Qualifier 1:

None

Limestone Qualifier 2:

Limesotne Qualifier 3:

Limestone Percent:

100

basalt Qualifier 1:

basalt Qualifier 2:

basalt Qualifier 3:

basalt Percent:

0

nari Qualifier 1:

nari Qualifier 2:

nari Qualifier 3:

nari Percent:

0

mudbrick Qualifier 1:

mudbrick Qualifier 2:

mudbrick Qualifier 3:

mudbrick Percent:

Arch Frags:

0

Fragment Type:

Quarry:

Wall Stones

Cobble (6-25 cm) %:

10

Small Boulder (25-50cm) %:

Medium Boulder (50-75cm) %:

70

Large Boulder (75-100cm) %:

10

Very Large Boulder (>1 m) %:

0

Chinkstones

Pebble (.2-6 cm) %:

0

Cobble (6-25 cm) %:

100

Fillstones: (in Rubble-filled Construction)

Cobble (6-25 cm) %:

0

Small Boulder (25-50cm) %:

0

Medium Boulder (50-75cm) %:

0

Large Boulder (75-100cm) %:

0

Very Large Boulder (>1 m) %:

0

Brick

Length (upper):

0.0

Length (lower):

0.0

Width (upper):

0.0

Width (lower):

0.0

Depth (upper):

0.0

Depth (lower):

0.0

Dressing: (Stone Only)

Unhewn %:

50

Semi-hewn %:

Dressed %:

0

Ashlar %:

0

Bossed %:

0

Tooling (Stone Only)

Upper Width:

0.0

Lower Width:

0.0

Upper Length:

0.0

Lower Length:

0.0

Sketch:

false

Photo:

false

Mortar

Dry-laid %:

100

Clay %:

0

Mud %:

0

Cement %:

0

Plaster %:

0

Average Thickness:

0.0

Facing

Facing:

Unfaced

Color:

Construction

Style:

Boulder & Chink

Support:

Free-standing

Tendencies:

Courses

Highest Count:

2

Lowest Count:

1

Random:

false

Rows

Highest Count:

2

Lowest Count:

1

Two with Rubble:

Random:

false

Measurements

Greatest Length in meters:

3.8

Greatest width in meters:

0

Smallest width in meters:

1.2

Greatest Height in meters:

0.9

Lowest Height in meters:

0.4

Orientation (degrees):

22

Dip (degrees):

0

Preservation

Preservation:

Partial Superstructure: Most

Lean Direction (degrees):

0

Lean Degrees:

0

Top Foundation Level:

Remarks

Remarks:

E balk obscures the E face making measurements impercise; of inferior workmanship compared to phase B wall below; courses & height are based in the depth of S 14

Levels

Location Top Level Bottom Level
11 913.46 0
17 913.38 0
17 913.48 0
23 913.5 0

Stratigraphy

Relationship Related to Related locus
Equals Wall A7K60:021
Under Earth layer A7K50:003
Over Wall A7K50:004
Over Earth layer A7K50:010
Sealed agnst by Earth layer A7K50:005
Bonded to Wall A7K50:007
Bonded to Wall A7K50:016
Under Wall A7K50:004
Abutted by Pit A7K50:011
Abutted by Wall A7K50:012
Abutted by Wall A7K50:017
Sealed agnst by Earth layer A7K50:008
Sealed agnst by Surface A7K50:009
Sealed agnst by Earth layer A7K50:010
Sealed agnst by Earth layer A7K50:013
Sealed agnst by Earth layer A7K50:015
Bonded to Wall A7K50:016

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
22 July, 2004 04A50264 Final from E
22 July, 2004 04A50268 Final from W
28 July, 2004 04A50009 U04 cleanup
29 June, 2004 04A50017 Progress
30 June, 2004 04A50029 Progress
1 July, 2004 04A50046 Progress
5 July, 2004 04A50081 Progress
6 July, 2004 04A50095 Progress
9 July, 2004 04A50136 Progress
12 July, 2004 04A50150 Progress
15 July, 2004 04A50186 Progress
16 July, 2004 04A50199 Progress
30 July, 1984 84A50481 E Balk
30 July, 1984 84A50481 E Balk
30 July, 1984 84A50477 S Balk
30 July, 1984 84A50477 S Balk
6 July, 1984 84A50119 Progress
9 July, 1984 84A50143 Progress
10 July, 1984 84A50161 Progress
11 July, 1984 84A50181 Progress
12 July, 1984 84A50203 Progress
13 July, 1984 84A50222 Progress
16 July, 1984 84A50242 Progress
16 July, 1984 84A50242 Progress
17 July, 1984 84A50262 Progress
17 July, 1984 84A50262 Progress
17 July, 1984 84A50263 Relation of Surf 9 to Walls 4,6, 7
17 July, 1984 84A50263 Relation of Surf 9 to Walls 4,6, 7
17 July, 1984 84A50264 Relation of Surf 9 to Walls 4,6, 7
17 July, 1984 84A50264 Relation of Surf 9 to Walls 4,6, 7
17 July, 1984 84A50265 Relation of Surf 9 to Walls 4,6, 7
17 July, 1984 84A50265 Relation of Surf 9 to Walls 4,6, 7
18 July, 1984 84A50289 Progress
18 July, 1984 84A50289 Progress
19 July, 1984 84A50311 Progress
19 July, 1984 84A50311 Progress
19 July, 1984 84A50313 Relation of Surf 10 to Surf 9 & Walls 4 & 6
19 July, 1984 84A50313 Relation of Surf 10 to Surf 9 & Walls 4 & 6
19 July, 1984 84A50314 Relation of Surf 9 & Walls 4, 6 & 7
19 July, 1984 84A50314 Relation of Surf 9 & Walls 4, 6 & 7
19 July, 1984 84A50315 Relation of Surf 9 & Walls 4, 6 & 7
19 July, 1984 84A50315 Relation of Surf 9 & Walls 4, 6 & 7
20 July, 1984 84A50333 Progress
20 July, 1984 84A50333 Progress
23 July, 1984 84A50355 Progress
23 July, 1984 84A50355 Progress
24 July, 1984 84A50367 Progress
24 July, 1984 84A50367 Progress
25 July, 1984 84A50401 Progress
26 July, 1984 84A50426 Progress
26 July, 1984 84A50426 Progress
26 July, 1984 84A50427 Relation of Surf 10 to Wall 12
26 July, 1984 84A50427 Relation of Surf 10 to Wall 12
26 July, 1984 84A50428 Relation of Surf 10 to Wall 12
26 July, 1984 84A50428 Relation of Surf 10 to Wall 12
26 July, 1984 84A50429 Relation of Surf 10 to Wall 12
26 July, 1984 84A50429 Relation of Surf 10 to Wall 12
27 July, 1984 84A50448 Progress
27 July, 1984 84A50448 Progress
27 July, 1984 84A50449 Wall 12 prior to removal
27 July, 1984 84A50449 Wall 12 prior to removal
27 July, 1984 84A50450 Blockage in Wall 4
27 July, 1984 84A50450 Blockage in Wall 4
30 July, 1984 84A50485 Progress
30 July, 1984 84A50485 Progress
31 July, 1984 84A50521 Progress
31 July, 1984 84A50521 Progress
1 August, 1984 84A50539 Progress E balk
1 August, 1984 84A50539 Progress E balk
2 August, 1984 84D77604 Progress E Balk removal
2 August, 1984 84D77604 Progress E Balk removal
3 August, 1984 84A50609 Progress E balk
3 August, 1984 84A50609 Progress E balk
25 July, 1984 8406-0825 Progress
2 August, 1984 84A50561 Basin in situ
5 August, 1984 84A50654 NE corner
5 August, 1984 84A50655 Blockage in Wall 4
5 August, 1984 84A50657 Final
5 August, 1984 84A50658 Wall 4B removed
6 August, 1984 84A50699 Final
6 August, 1984 84A50699 Final
6 August, 1984 8439-0306 Final
22 July, 2004 04A50256 Progress
22 July, 2004 04A50265 Final from S
6 August, 1984 84A50701 Final field
6 August, 1984 84A50701 Final field
6 August, 1984 84A50702 Final field
6 August, 1984 84A50702 Final field
6 August, 1984 84A50703 Final field
6 August, 1984 84A50703 Final field
6 August, 1984 84A50704 Final field
6 August, 1984 84A50704 Final field
12 July, 2012 12A50046 PROGRESS
16 July, 2012 12A50071 PROGRESS
13 July, 2012 12A50059 PROGRESS