Locus A.7K42.027

Installation · Tabun foundation

General Information

Locus Type Installation
Supervisor D. Herr
Designation Tabun foundation
Reason Several rocks under tabun
Top Separation Very Clear
Bottom Separation Very Clear
Start Date 2 August, 1989
End Date 3 August, 1989

Interpretation

Function To level and stabalize tabun
Stratigraphy remarks Over Surf 14
Balk
Phase
Stratum

Installation Description

Type

Certain:

Tabun foundation

Probable:

Possible 1:

Possible 2:

Material

Limestone Qualifier 1:

Limestone Qualifier 2:

Limestone Percent:

Bedrock Qualifier 1:

Bedrock Qualifier 2:

Bedrock Percent:

0

Ceramic Qualifier 1:

Ceramic Qualifier 2:

Ceramic Percent:

0

Mud Qualifier 1:

Mud Qualifier 2:

Mud Percent:

Mudbrick Qualifier 1:

Mudbrick Qualifier 2:

Mudbrick Percent:

Nari Qualifier 1:

Nari Qualifier 2:

Nari Percent:

0

Plaster Qualifier 1:

Plaster Qualifier 2:

Plaster Percent:

0

Earth Qualifier 1:

Earth Qualifier 2:

Earth Percent:

0

Stone Qualifier 1:

None

Stone Qualifier 2:

Stone Percent:

100

Plan

Type:

Triangular

Quality 1:

Nearly

Quality 2:

Remarks:

Lining

Lining:

None

Measurements

Greatest Length in meters:

1.47

Greatest width in meters:

0.77

Smallest width in meters:

0.37

Greatest Height in meters:

0

Lowest Height in meters:

0.12

Orientation (degrees):

0

Remarks

Remarks:

Supplements

Additional descriptions recorded later as the locus was further excavated.

Supplement 1

Levels

Location Top Level Bottom Level
3 912.75 912.63
10 912.76 912.64
10 913.05 912.64
10 912.62 912.41

Stratigraphy

Relationship Related to Related locus
Under Installation A7K42:025
Under Earth layer A7K42:026
Over Surface A7K42:014
Abuts Wall A7K42:021
Abutted by Wall A7K42:015
Sealed agnst by Earth layer A7K42:033

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
2 August, 1989 89A42028 Tabun
4 August, 1989 89A42030 Final
18 June, 1992 92A42026 Cleanup