Locus A.7K41.005

Architecture · N-S wall

General Information

Locus Type Architecture
Supervisor J. Hackwell
Designation N-S wall
Reason Six stones in a row
Top Separation Average
Bottom Separation Average
Start Date 05 Jul, 1984
End Date 05 Jul, 1984

Interpretation

Function Part of minor additions to a public building
Stratigraphy remarks
Balk
Phase
Stratum

Architecture Description

Material

chert Qualifier 1:

chert Qualifier 2:

chert Qualifier 3:

chert Percent:

0

Limestone Qualifier 1:

Limestone Qualifier 2:

Limesotne Qualifier 3:

Limestone Percent:

100

basalt Qualifier 1:

basalt Qualifier 2:

basalt Qualifier 3:

basalt Percent:

0

nari Qualifier 1:

nari Qualifier 2:

nari Qualifier 3:

nari Percent:

0

mudbrick Qualifier 1:

mudbrick Qualifier 2:

mudbrick Qualifier 3:

mudbrick Percent:

Arch Frags:

0

Fragment Type:

Quarry:

Wall Stones

Cobble (6-25 cm) %:

75

Small Boulder (25-50cm) %:

Medium Boulder (50-75cm) %:

0

Large Boulder (75-100cm) %:

0

Very Large Boulder (>1 m) %:

0

Chinkstones

Pebble (.2-6 cm) %:

0

Cobble (6-25 cm) %:

0

Fillstones: (in Rubble-filled Construction)

Cobble (6-25 cm) %:

0

Small Boulder (25-50cm) %:

0

Medium Boulder (50-75cm) %:

0

Large Boulder (75-100cm) %:

0

Very Large Boulder (>1 m) %:

0

Brick

Length (upper):

0.0

Length (lower):

0.0

Width (upper):

0.0

Width (lower):

0.0

Depth (upper):

0.0

Depth (lower):

0.0

Dressing: (Stone Only)

Unhewn %:

100

Semi-hewn %:

Dressed %:

0

Ashlar %:

0

Bossed %:

0

Tooling (Stone Only)

Upper Width:

0.0

Lower Width:

0.0

Upper Length:

0.0

Lower Length:

0.0

Sketch:

false

Photo:

false

Mortar

Dry-laid %:

100

Clay %:

0

Mud %:

0

Cement %:

0

Plaster %:

0

Average Thickness:

0.0

Facing

Facing:

Unfaced

Color:

Construction

Style:

Boulder & Chink

Support:

Free-standing

Tendencies:

Courses

Highest Count:

0

Lowest Count:

1

Random:

false

Rows

Highest Count:

0

Lowest Count:

2

Two with Rubble:

Random:

false

Measurements

Greatest Length in meters:

1.5

Greatest width in meters:

25

Smallest width in meters:

15

Greatest Height in meters:

25

Lowest Height in meters:

15

Orientation (degrees):

25

Dip (degrees):

0

Preservation

Preservation:

Partial Superstructure: Little

Lean Direction (degrees):

0

Lean Degrees:

0

Top Foundation Level:

Remarks

Remarks:

U84: Future excavation will inform; these stones consistent with Wall 22 fill stones in a larger construction

Levels

Location Top Level Bottom Level
11 913.32 912.89
17 913.347 912.77

Stratigraphy

Relationship Related to Related locus
Under Earth layer A7K41:001
Abuts Wall A7K41:023

Pails

Number Date Baskets Total Diagnostic Published

Photos

Date Photo Number Subject Photo
11 Jul, 1984 84A41182 Progress
12 Jul, 1984 84A41201 Progress
13 Jul, 1984 84A41220 Progress
17 Jul, 1984 84A41260 Progress
18 Jul, 1984 84A41290 Progress
19 Jul, 1984 84A41308 Progress
20 Jul, 1984 84A41331 Progress
23 Jul, 1984 84A41353 Progress
24 Jul, 1984 84A41365 Progress
27 Jul, 1984 84A41446 Progress
10 Jul, 1984 8411-0910 Progress
02 Aug, 1984 84A41558 Progress