Locus A.7K40.008

Architecture · N-S wall

General Information

Locus Type Architecture
Supervisor B. Adams
Designation N-S wall
Reason Appearance of big horizontal-lying worked stones
Top Separation Clear
Bottom Separation Very Clear
Start Date 13 July, 1984
End Date 16 July, 2008

Interpretation

Function Forms prob S limit of building extending to N and E; N of Wall 14 is a door opening (L 15) giving access in E-W direction to building; possibly L 21 is the same phase forming W limit of the building; Wall 8 is thus the E wall of the room
Stratigraphy remarks At a later phase Wall 8 seems to have been used (at least partly) as foundation of Wall 5 with same orientation but is placed more to the W; Poss belongs to the same phase as L 21
Balk
Phase
Stratum

Architecture Description

Material

chert Qualifier 1:

chert Qualifier 2:

chert Qualifier 3:

chert Percent:

0

Limestone Qualifier 1:

None

Limestone Qualifier 2:

Limesotne Qualifier 3:

Limestone Percent:

100

basalt Qualifier 1:

basalt Qualifier 2:

basalt Qualifier 3:

basalt Percent:

0

nari Qualifier 1:

nari Qualifier 2:

nari Qualifier 3:

nari Percent:

0

mudbrick Qualifier 1:

mudbrick Qualifier 2:

mudbrick Qualifier 3:

mudbrick Percent:

Arch Frags:

0

Fragment Type:

Quarry:

Wall Stones

Cobble (6-25 cm) %:

50

Small Boulder (25-50cm) %:

Medium Boulder (50-75cm) %:

40

Large Boulder (75-100cm) %:

0

Very Large Boulder (>1 m) %:

0

Chinkstones

Pebble (.2-6 cm) %:

0

Cobble (6-25 cm) %:

0

Fillstones: (in Rubble-filled Construction)

Cobble (6-25 cm) %:

0

Small Boulder (25-50cm) %:

0

Medium Boulder (50-75cm) %:

0

Large Boulder (75-100cm) %:

0

Very Large Boulder (>1 m) %:

0

Brick

Length (upper):

0.0

Length (lower):

0.0

Width (upper):

0.0

Width (lower):

0.0

Depth (upper):

0.0

Depth (lower):

0.0

Dressing: (Stone Only)

Unhewn %:

10

Semi-hewn %:

Dressed %:

0

Ashlar %:

0

Bossed %:

0

Tooling (Stone Only)

Upper Width:

0.0

Lower Width:

0.0

Upper Length:

0.0

Lower Length:

0.0

Sketch:

false

Photo:

false

Mortar

Dry-laid %:

100

Clay %:

0

Mud %:

0

Cement %:

0

Plaster %:

0

Average Thickness:

0.0

Facing

Facing:

Unfaced

Color:

Construction

Style:

Boulder & Chink

Support:

Tendencies:

Looks massive

Courses

Highest Count:

0

Lowest Count:

0

Random:

false

Rows

Highest Count:

3

Lowest Count:

2

Two with Rubble:

Random:

false

Measurements

Greatest Length in meters:

3.9

Greatest width in meters:

1.3

Smallest width in meters:

1.1

Greatest Height in meters:

0

Lowest Height in meters:

2

Orientation (degrees):

10

Dip (degrees):

0

Preservation

Preservation:

Partial Superstructure: Little

Lean Direction (degrees):

84

Lean Degrees:

12

Top Foundation Level:

Remarks

Remarks:

Only top of Wall 8 was uncovered during U84 season; partly covered by Wall 5; top shows only slightly decayed stones; masonry: cobbles counted as wall-stones but are possibly chinkstones; bottom not reached in U92; L 14 was originally called L 8

Levels

Location Top Level Bottom Level
6 0 911.34
11 912.14 0
11 912.14 911.01
12 912.14 0
16 912.51 911.05
17 912.05 911.31
18 912.05 0
22 912.46 911.12
23 912.08 910.17
24 911.77 0

Stratigraphy

Relationship Related to Related locus
Sealed agnst by Earth layer A7K40:054
Sealed agnst by Surface A7K40:055
Sealed agnst by Earth layer A7K40:056
Sealed agnst by Earth layer A7K40:057
Sealed agnst by Earth layer A7K40:066
Under Wall A7K40:005
Under Surface A7K40:007
Abuts Wall A7K41:004
Wall A7K40:025
Sealed agnst by Earth layer A7K40:024
Abutted by Installation A7K40:031
Abutted by Wall A7K40:033
Sealed agnst by Earth layer A7K40:032
Sealed agnst by Surface A7K40:035
Sealed agnst by Earth layer A7K40:036
Sealed agnst by Surface A7K40:038
Sealed agnst by Earth layer A7K40:044
Sealed agnst by Earth layer A7K40:046
Sealed agnst by Surface A7K40:047
Sealed agnst by Earth layer A7K40:048
Sealed agnst by Earth layer A7K40:053
Sealed agnst by Earth layer A7K40:080
Sealed agnst by Surface A7K40:081
Sealed agnst by Earth layer A7K40:077
Sealed agnst by Earth layer A7K40:082
Sealed agnst by Earth layer A7K40:088
Abutted by Wall A7K40:079

Pails

Number Date Baskets Total Diagnostic Published
267 1 July, 2008 10 25 2 0

Pottery Readings

Count Quantity modifier Form Period Period modifier Question
0 Late Iron 2/Persian 1 bod
1 Jug Iron 2
1 Bowl Iron 2
1 Lamp Iron 2
268 3 July, 2008 18 36 6 0

Pottery Readings

Count Quantity modifier Form Period Period modifier Question
1 Jug Iron 2
1 Krater Iron 2
1 Bowl Iron 2
270 4 July, 2008 12 28 1 0

Pottery Readings

Count Quantity modifier Form Period Period modifier Question
0 Iron 2 bods
1 Jar,holemouth Early Bronze

Photos

Date Photo Number Subject Photo
16 July, 1984 84A40241 Progress
2 August, 1984 84A40559 Progress
17 July, 1984 84A40259 Progress
18 July, 1984 84A40291 Progress
19 July, 1984 84A40309 Progress
23 July, 1984 84A40354 Progress
27 July, 1984 84A40447 Progress
1 August, 1984 84A40540 Progress, N balk
3 August, 1984 84A40608 Progress, N-bulk removal)
2 July, 1992 92A40-02P Progress
2 July, 1992 92A40-05C 2P
26 June, 1992 92A41006 Progress
26 June, 1992 92A41006 Progress
26 June, 1992 92A41006 Progress
29 June, 1992 92A41007 Progress
29 June, 1992 92A41007 Progress
30 June, 1992 92A41008 Progress
30 June, 1992 92A41008 Progress
30 June, 1992 92A41008 Progress
1 July, 1992 92A41009 Progress
1 July, 1992 92A41009 Progress
2 July, 1992 92A41011 W side of room
9 July, 1992 92A41017 Progress
3 July, 1992 92A41014 Progress
6 July, 1992 92A41015 Progress
7 July, 1992 92A41016 Progress
10 July, 1992 92A41018 Progress
13 July, 1992 92A41019 Progress
14 July, 1992 92A41020 Wall 31
15 July, 1992 92A41021 Progress
16 July, 1992 92A41022 Progress
17 July, 1992 92A41023 Progress
20 July, 1992 92A41024 Progress
22 July, 1992 92A41025 Final
2 July, 1992 92A41010 Room
2 July, 1992 92A41012 S side of room
24 July, 1984 84A40402 Progress
30 July, 1984 84A40480 E balk
23 June, 1992 92A41004 Progress
24 June, 1992 92A41005 Progress
12 July, 2004 04A40149 Progress
12 July, 2004 04A40155 Surf 35
13 July, 2004 04A40163 Progress
14 July, 2004 04A40174 Progress
15 July, 2004 04A40185 Progress
6 July, 2004 04A40094 Progress
7 July, 2004 04A40109 Progress
8 July, 2004 04A40122 Progress
9 July, 2004 04A40135 Progress
16 July, 2004 04A40198 Progress
19 July, 2004 04A40211 Progress
20 July, 2004 04A40223 Progress
21 July, 2004 04A40238 Progress
22 July, 2004 04A40255 Progress
26 July, 2004 04A40291 Progress
27 July, 2004 04A40307 Progress
29 July, 2004 04A40349 Progress
30 July, 2004 04A40359 Final Passageway
30 July, 2004 04A40360 Final
6 July, 2006 06A40073 Progress
7 July, 2006 06A40094 Progress
10 July, 2006 06A40112 Progress
13 July, 2006 06A40170 Progress
17 July, 2006 06A40207 Progress
20 July, 2006 06A40264 Progress
21 July, 2006 06A40281 Progress
25 July, 2006 06A40316 Progress
26 July, 2006 06A40330 Progress
26 July, 2006 06A40331 Progress
27 July, 2006 06A40349 Progress
27 July, 2006 06A40350 Progress
27 July, 2006 06A40351 Progress
28 July, 2006 06A40365 Progress
30 July, 2006 06A40389 Progress
31 July, 2006 06A40404 Progress
31 July, 2006 06A40406 Progress
2 August, 2006 06A40441 Final from N
2 August, 2006 06A40442 Final from S
2 August, 2006 06A40443 Final from W
30 June, 2006 06A40008 Progress
3 July, 2006 06A40019 Progress
4 July, 2006 06A40036 Progress
5 July, 2006 06A40054 Progress
28 July, 2004 04A40334 Progress
3 July, 2008 08A40088 Progress
4 July, 2008 08A40110 Progress
7 July, 2008 08A40140 Progress
7 July, 2008 08A40141 Progress
7 July, 2008 08A40142 Progress
8 July, 2008 08A40172 Progress
6 August, 1984 84A40698 Final